Documentation
How to install and use Kanban CE. Tested with OpenProject 17.7–17.9.
- Install
- Using the board
- Move cards
- Quick add
- Collapse columns
- Filters and saved views
- Swimlanes
- WIP limits
- The details popup
- Relations and child items
- Comments and pasted images
- Files and the image viewer
- Watchers
- Board settings
- Administration and license
- Using it on a phone
- Troubleshooting
1. Install
Tested with OpenProject 17.7–17.9. The plugin requires OpenProject 17.0 or newer and needs no extra services.
- Sign in at kanbance.drivechain.co.za and download the plugin package from Dashboard → Downloads. Your license key is under Dashboard → Licenses.
- Unzip the package to
/opt/openproject-plugins/, giving/opt/openproject-plugins/openproject-kanban-ce. - Add the
gemline below to/etc/openproject/Gemfile.custom(package installs) or toGemfile.pluginsin the OpenProject folder (source installs), then run the commands for your installation type. - Set Administration → General → Host name to your OpenProject address. The license is registered to that domain.
- Go to Administration → Kanban settings, paste your license key and save. The first check registers the domain, so the server must be able to reach
https://kanbance.drivechain.co.zaover HTTPS. - Enable the module in each project under Project settings → Modules → Kanban Board.
- Under Administration → Roles and permissions, give roles
view_kanban_board(see the board) andmanage_kanban_board(change board settings and views).
# Add to Gemfile.custom or Gemfile.plugins gem "openproject-kanban", path: "/opt/openproject-plugins/openproject-kanban-ce"
Package installation:
sudo openproject configure
Source installation (as the OpenProject user):
cd /opt/openproject bundle install RAILS_ENV=production bundle exec rails db:migrate RAILS_ENV=production bundle exec rails assets:precompile sudo systemctl restart openproject openproject-worker # or your service names
Docker (the openproject/openproject image, on its own or with docker compose): you don't edit a Gemfile. Build your own image with the Dockerfile included in the package, from the folder that contains the unzipped plugin. Set OPENPROJECT_TAG to the OpenProject version you run (full image, not -slim).
cd /opt/openproject-plugins docker build --pull -f openproject-kanban-ce/docker/Dockerfile \ --build-arg OPENPROJECT_TAG=17 -t openproject-kanban .
Then run openproject-kanban in place of openproject/openproject:<tag>. The plugin's database table is created when the container starts. Rebuild the image after every OpenProject or Kanban CE upgrade.
Already running OpenProject in Docker?
Your data lives in your volumes (or your compose database), so switching to the plugin image keeps it. The plugin's table is created on the next start, and you can switch back to the old image at any time. Build with the exact OpenProject version you run now: a moving tag such as 17 can point at a different 17.x and upgrade OpenProject by accident.
1. Find your current version and settings (single container; for compose, look at TAG in .env or run docker compose config --images):
docker inspect <container> --format '{{index .Config.Labels "org.opencontainers.image.version"}}'
docker inspect <container> --format '{{json .Mounts}} {{json .HostConfig.PortBindings}}'
docker inspect <container> --format '{{json .Config.Env}}' # SECRET_KEY_BASE, OPENPROJECT_HOST__NAME, ...2. Build the image on that version (full image tag, without -slim):
cd /opt/openproject-plugins docker build --pull -f openproject-kanban-ce/docker/Dockerfile \ --build-arg OPENPROJECT_TAG=<your-version> -t openproject-kanban .
3a. Single container: recreate it from the new image with the same volumes, ports and environment.
docker stop <container> && docker rm <container> docker run -d --name <container> -p <port>:80 \ -e SECRET_KEY_BASE=<same as before> -e OPENPROJECT_HOST__NAME=<same> <other -e as before> \ -v <pgdata-volume>:/var/openproject/pgdata \ -v <assets-volume>:/var/openproject/assets \ openproject-kanban
3b. docker compose: add docker-compose.override.yml next to your docker-compose.yml, then run docker compose up -d. pull_policy: never stops docker compose pull from looking for the image online.
services:
web: { image: openproject-kanban, pull_policy: never }
worker: { image: openproject-kanban, pull_policy: never }
cron: { image: openproject-kanban, pull_policy: never }
seeder: { image: openproject-kanban, pull_policy: never }Switching back: run the container again with openproject/openproject:<your-version>, or remove the override file and run docker compose up -d. The plugin's table stays in the database and does no harm.
Upgrading OpenProject later: rebuild with the new version (OPENPROJECT_TAG), then recreate the container or run docker compose up -d.
Upgrading: unzip the new version over the old folder (same path), then repeat the commands for your installation type and restart (Docker: rebuild the image). After an OpenProject upgrade, check that your Gemfile line is still there (Gemfile.custom survives package upgrades; Gemfile.plugins in a source checkout may need re-adding).
2. Using the board
Open any project with the Kanban Board module enabled. Columns are the project's OpenProject statuses; each card is a work package.

- Cards show a type colour edge and badge, an initials avatar, the due date (amber when soon, red when overdue unless closed) and a percent-done bar. Click a card to open the details popup.
- Large boards: columns show 50 cards at a time with a Show more button.
- Zoom: the − 100% + control next to Settings is remembered per board in your browser.
- Live updates: the board checks for changes about every 30 seconds and updates only the cards that changed. It skips cards you are dragging or have open.
3. Move cards
Change a card's status
- Press and hold a card. You can grab it anywhere on the card.
- Drag it to another column. You can drop it anywhere on the column, header included.
- Release. The card now has that column's status.
The move goes through OpenProject's update service. Workflow rules apply, a disallowed move shows OpenProject's error message, and the change appears in the work package activity and notifications. Drag and drop can be turned off under Board settings.

Change the order inside a column
- Drag a card up or down within its column.
- Drop it where you want it.
The order is remembered per board. It is separate from the work package position used by Backlogs.
Reorder columns
Board managers can drag a column by its header to a new place. The order saves straight away to the board's custom column list, the same one you edit under Settings → Columns.
4. Quick add
- Click + in the header of the column you want.
- Type a subject.
- Press Enter. The new work package appears in that column.

- You need the Add work packages permission.
- If the workflow does not allow new work packages in that status, the card is created with the default status and moved if allowed.
- The + is hidden on collapsed columns.
5. Collapse columns
Collapse columns you are not working in, so the others get more room.
- Click the collapse button in the column header (tooltip: Collapse column).
- The column shrinks to a slim bar that shows its name and card count.
- Click the same button on the bar to expand it again.

- The state is remembered for the project.
- Collapse is off in swimlane mode.
6. Filters and saved views
The filter bar sits above the columns. All filters combine, and column counts show the matching cards.
Filter by type
- Open the Type filter.
- Tick the types you want, for example Story and Bug.
- The board shows only those types. Press Clear to reset.
- Type has one checkbox per type enabled in the project, shown in the type's colour. Ticking none or all types means no type filter.
- Search matches work package title or ID. On large boards it loads the remaining cards first.
- Assignee and Priority filters include unassigned and no priority.
- Clear resets search, filters and types.


Save a view
A saved view stores a name, the swimlane setting, search, Assignee, Priority and Type filters for this board.
- Set up the filters you want.
- Click Save view.
- Type a name.
- Tick Share with the team if you want others to see it. Only board managers can share.
- Click Save.
Views are private by default. You can delete your own views; managers can also delete shared ones.

7. Swimlanes
Choose Swimlanes in the filter bar to group cards into rows by assignee, priority or type.
- Drop a card into another lane and that field changes (through OpenProject's update service, so its rules apply).
- Collapse a lane by clicking its heading. The state is remembered in your browser.
- Swimlane mode shows all cards (no batches of 50). Column collapse and header-drag reordering are off in this mode.
- Swimlane settings can be part of a saved view.

8. WIP limits
- Open Settings → Columns.
- Enter a limit for a column.
- Save.
The column header then shows (n / limit). It turns amber when the column reaches its limit and red when it is over, and you get a warning when a move takes a column over its limit.

9. The details popup
Click a card to open the work package in a popup over the board. Esc closes it, Ctrl/⌘+Enter saves, and you get a warning before discarding unsaved edits. The link icon opens the full work package in a new tab. The popup follows OpenProject's theme colours, including dark mode.
Details
The form is built from the work package's edit schema, in the order set under Administration → Types → Form configuration. Custom fields, sprint, backlog bucket, target versions, story points, dates and booleans appear; read-only fields stay read-only; totals from children are shown. Work and remaining work show as 2h 30m and can be typed as 2.5 or 2h 30m. Only changed fields are sent. Errors from OpenProject appear next to the field, and if someone else saved first you are offered a reload.

10. Relations and child items
Open the Relations tab. It lists Parent and Children (an epic lists its child work packages), and every relation type from this work package's side, for example "Blocked by". Click a related item to open it in the popup.

Add a relation
- Open the Relations tab.
- Click + Add relation.
- Pick the relation type, for example "Related to".
- Search by ID or subject and choose a result.

To remove a relation, use its remove button and confirm.
Create a child item
- Open the Relations tab.
- Click + New child.
- Pick the type.
- Type a subject.
- Click Create.

12. Files and the image viewer
The Files tab shows image thumbnails (for images up to 15 MB). Other files show a type badge. You can delete attachments and see upload progress.

- Click a thumbnail to open the viewer.
- Press the left and right arrow keys to step through the files.
- Press Esc to close the viewer. The popup stays open.

13. Watchers
- Open the Watchers tab.
- Click Watch to follow the work package and receive its notifications.
- Click Stop watching to stop.

14. Board settings
Open Settings from the board header. Board settings need the manage permission.
Columns

- Columns: Automatic (statuses in the project's type workflows plus any status a card is in) or Custom, where you pick the statuses and drag them into order. Saved per project.
- Hide empty columns. A notice shows how many cards are in columns hidden on this board.
- Column colours: a colour picker per status sets that column's header colour for this board; ↺ resets it.
- WIP limit per column (see WIP limits).
Board behaviour

- Drag and drop on or off.
- Quick filters: show or hide the search and filter bar.
- Rich text editor on or off.
- Show IDs: show or hide work package IDs on cards.
- Notifications: when off, only errors are shown.
- Max cards per column: how many cards load before Show more (default 50).
- Auto refresh: how often the board checks for changes (default every 30 seconds).
- Default card colour: the card background colour.
15. Administration and license
Go to Administration → Kanban settings. Paste the license key (from Dashboard → Licenses on kanbance.drivechain.co.za) into the license key field and save. The page shows the plugin status, the number of projects with the Kanban Board module enabled, and the license status.
- The key must match your domain exactly, including the subdomain.
- Your server must be able to reach kanbance.drivechain.co.za over HTTPS to check the key.
- When your subscription ends, your license keeps working with the version you have installed. Downloads and email support stop until you renew at /pricing; a version released after your end date shows a license notice.
- Give roles
view_kanban_boardandmanage_kanban_boardunder Administration → Roles and permissions.
Problems? See License or key problems.
16. Using it on a phone
Kanban CE works in the browser on phones and tablets. Under 768px wide:
- Filters sit two per row, with their labels above.
- Saved views and Clear take a full row.
- The Type dropdown fits the screen.
- Inputs use 16px text so iOS does not zoom in.

Need more help? See Troubleshooting or email support@drivechain.co.za.
11. Comments and pasted images
Activity
The Activity tab shows changes and comments with user names and relative times. Use Comments only and Newest first to change the view. Times follow OpenProject's date format, time format and your time zone.
Add a comment with an image
Pasting or dropping an image into the description works the same way. Both editors have an Upload image button in the toolbar.